Scope of work
Solar farm fencing, gates and CCTV
The scope that decides whether the plant is insurable on the day it is handed over.

- 01Perimeter fencing with wildlife corridors where planning requires them
- 02Vehicle gates, pedestrian gates and access control
- 03CCTV columns, cameras, power and data routes
- 04Detection, lighting and alarm transmission to the monitoring centre
- 05As-built layout, coverage plan and handover documentation
Requirements come from three directions at once
Solar farm fencing requirements rarely sit in one document. Planning conditions dictate height, materials and wildlife gaps; the insurer dictates detection and response; the tender dictates the rest. Where those three conflict — and they often do on agricultural land — we resolve it before ordering material, not after the posts are in the ground.
Coverage is planned against the actual field layout, so cameras see approach routes and inverter stations rather than empty rows. The coverage plan is part of the handover pack.
Fenced in the right order
Fencing installed too early blocks the machinery still needed inside the field; installed too late it delays energisation and leaves finished plant unsecured. We sequence the perimeter against the construction programme so the last access opening closes when the last delivery is in.
Where a solar farm fencing tender is packaged separately from the main works, we bid it as a standalone scope and coordinate with the principal contractor on site access and interface points.
Frequently asked questions
01Do you install fencing on projects you did not build?+
Yes. Fencing and CCTV are regularly contracted separately, including on plants built by another contractor or already in operation.
02Can you meet insurer requirements for detection and monitoring?+
Yes. Send us the insurer specification with the tender documents. Detection type, camera coverage and alarm transmission are priced against that specification rather than a generic package.
03How do you handle wildlife corridor conditions?+
Where planning requires ground clearance or wildlife passages, they are set out with the fence line and recorded in the as-built layout, since these are usually checked at the planning compliance inspection.
Structures & piling
Pile driving, mounting systems, trackers and module installation on any ground condition.
All servicesCabling & civil works
Trenching, DC/AC routes, earthing and full site restoration.
All servicesElectrical & substations
Inverters, transformer stations and LV/MV equipment up to the agreed grid point.
All servicesTesting & commissioning
Measurements, protocols, thermal inspection and grid launch.
All servicesNEMESIS.SOLAR
Send us the site. We will price the scope.
Capacity, country, ground conditions and the packages you need — that is enough for a first €/MW estimate and a mobilisation plan.