Utility-scale solar EPC / BoP contractor · across Europe

Utility-scale solar EPC contractor.Building
energy
at scale.

Turnkey solar power plants — from the first pile to commissioning. Mobile teams, machinery and one point of responsibility.

Explore capabilities
Pile driving
Structures
Cable routes
Electrical works
Security
Commissioning
All Europe
Turnkey
/ Approach

Not just installation. A controlled outcome.

We enter the site with a complete operating system: people, machinery, processes and quality control. Unlike working with several solar farm construction companies in parallel, you coordinate one contract and one schedule.

Complex terrain

Slopes, rocky soil, reclaimed land and non-standard structures.

Flexible delivery

We use our own resources or client machinery and fuel to optimise cost.

Transparent control

One schedule and one responsibility for quality, safety and launch.

Construction on site
01Construction on site
Operational plant inspection
02Operational plant inspection
/ Scope of work

Selected delivery

Proven on site.

Turnkey utility-scale delivery in Sweden and Germany — from site preparation to grid commissioning.

View all projects

Nemesis Solar journal

Latest from the field.

All articles

/ One responsibility

Capabilities under one responsibility.

Eight workstreams — one team, one schedule and one quality standard on site.

01

Pile driving

02

Structures

03

Cable routes

04

Electrical works

05

Security

06

Commissioning

07

All Europe

08

Turnkey

Construction on site
On siteConstruction on site

Own resources

Ready for an empty site.

We organise machinery, fuel, tools and mobile teams. You get one controlled delivery system instead of disconnected contractors.

  • Pile-driving equipment
  • Excavators and trenchers
  • Installation and measuring tools
/ 5 steps

From enquiry to energisation.

  1. 01

    Project review

    We analyse the design, site conditions and required scope.

  2. 02

    Price per MW

    We define responsibilities and prepare a transparent proposal.

  3. 03

    Mobilisation

    Teams, machinery, tools and fuel arrive on site.

  4. 04

    Construction

    All works follow one schedule, quality system and HSE standard.

  5. 05

    Commissioning

    Testing, documentation and handover of the operational plant.

EU mobility

One team. All of Europe.

We mobilise across continental Europe — from Iberia to the Baltics and from Scandinavia to the Balkans.

01Germany · Benelux

Turnkey EPC

/ Commercial model

A clear price per MW.

Option 01

Our full resource

Machinery, fuel, teams, tools and site organisation are fully on us.

Maximum autonomy
Option 02

Your resource

We use available client machinery or fuel and reduce the total construction price.

Optimised price

New project

Let’s price your site.

Tell us the capacity, country and required scope. We will prepare an initial estimate and mobilisation plan.

/ FAQ

Frequently asked questions.

01How much does a solar farm cost to build per MW?+

There is no honest single figure. The price depends on ground conditions, terrain, capacity, the scope boundary and any resources you provide yourself. We review the design and prepare a project-specific €/MW calculation with the exclusions written out.

02What is the solar farm construction cost per acre?+

Cost per acre is even less transferable between projects than cost per MW, because module density, row pitch and cable route length vary far more than plant capacity does. We quote per MW against your layout and convert to area only if your financial model requires it.

03Do you work as a turnkey solar EPC contractor or in separate packages?+

Both. We deliver the complete installation under one turnkey solar EPC contract, or take structures, cabling, electrical works, fencing and commissioning as standalone packages behind another contractor.

04Which countries do you cover?+

Our mobile teams work across continental Europe and adapt mobilisation to local certification, documentation and language requirements.

05Can we provide machinery and fuel?+

Yes. Client-provided machinery, fuel or personnel come out of the estimate and the price per MW drops accordingly.

Partnerships

/ 08

Let’s build at scale.
Together.

We work with proven subcontractors, suppliers, equipment owners, developers and investment partners across Europe.

01Subcontractors02Suppliers03Equipment04Developers
Introduce your companyEU / 2026